MRG Energy
PROJECTS

HIGH CONCENTRATION PLANT - FERREIRA DO ALENTEJO ...

Project located in Ferreira do Alentejo, Beja. It is a central with an installed power capacity of 3.15 MW whose ...

HIGH CONCENTRATION PLANT - ALQUEVA (1MW)

Project located in Moura, Beja. It is a central with an installed capacity of 1MW with a 2680.3MWh / year capacity.

HIGH CONCENTRATION PLANT - ESTOI (1MW)

Project located in Estoi, Faro. It is a central with an installed capacity of 1MW with a 2680.3MWh / year capacity.

Micro Generation Project - BANHOS SECOS

The microgeneration system placed at a private house in Coimbra, uses 20 monocrystalline silicon panels.

Micro-generation Projects – MRG’s ...

MRG pioneered the installation and operation of solar systems for electricity production, since 2009, having three ...

COIMBRA PUBLIC LIGHTING

The MRG focus on energy began in 2011 with Coimbra’s Public Lighting Project preparation. This project ...