Construction of an Elevating System in Verdelha, which included a wastewater pumping station, a final stretch of the granitic arrival emissary with an underpass by clamping under the railway line, sheathed, and a lifting conduct. It was also executed an electric power station. This contract also included the construction of a second Elevating System (Sobralinho), which involved a water waste elevating station and a pumping conduct.