The intervention included the demolition of the multipurpose pavilion and the construction of a new central building. It was also built a new building for classrooms and a gallery that runs through the central building, connecting the four blocks. It was also made an expansion and renovation of the workshops, with the construction of a new floor, as well as the renovation of the gym coatings and reconstruction of the changing rooms, bathrooms and medical office, a storage and new fitness room. The playing fields were also increased and renewed. The contract included as well the redesign and renovation of most outdoor areas of the school.