The contract for the construction of the School Complex included the construction of a sports pavilion, indoor swimming pools, playing fields, infrastructure, special facilities, equipment and outdoor arrangements.
The work resulted in the execution of five blocks, interconnected through the circulation areas. The blocks A and B are on two levels and are intended to classrooms, while in the blocks C and D, a floor refers to areas of baths and cafeteria. Yet, the block (a single floor with a metal sandwich cover and thermal insulation) includes the pools and the pavilion plus special facilities, equipment and outdoor arrangements.
Constructively, the building became a reinforced concrete structure consisting of direct foundations, Spread footing, foundation beams, pillars, retaining walls, beams, stairs, crown of the roof, traditional and fungiform solid slabs, corrugated sheets fortified in two directions with or without molds.