MRG Constrution
CONSTRUCTION WORKS

SERPA’S MINI-HYDROELECTRIC PLANT

Serpa’s Mini-Hydroelectric Plant, with an installed capacity of 1.5 MW, joins Alvito’s and Odivelas’ Mini-Hydroelectric Central to Pisão’s Central. 
Brinches’ Elevating Conduct as well as Brinches South Reservoir’s is 4380 meters long, a reservoir by excavation and a landfill, lined with geomembrane and with a capacity of 322,000 cubic meters, which receives water through the Brinches’ Pumping Station.